What does not need a permit in Miami-Dade, and the word on that list that costs people the most

Miami-Dade County publishes a list of work that does not require a building permit. It is a genuinely useful document, and it is also the source of a particular kind of violation we see constantly, because of one word people read too quickly.

The word is exempt. On more than a dozen entries, the County writes that something is exempt from a building permit and then adds, in parentheses, that it still requires a Zoning Improvement Permit. A homeowner reads the first half, builds the thing, and finds out eighteen months later at closing that the property has an open zoning issue.

This article reorganizes the County's exemptions around the question people are actually asking, which is not "is this exempt from the Florida Building Code" but "can I do this without filing anything, and if not, what do I file." It also covers the two patterns that run through the whole list and that nobody points at: pools are carved out of almost every exemption, and a large share of the exemptions only exist when a licensed contractor does the work.

Scope note before anything else. This list governs unincorporated Miami-Dade County. If your address is inside a city, your building department sets its own rules, and several of them are stricter. More on that below.

There are two permits, and people only think about one

A building permit is about construction: is the thing structurally sound, does it meet the Florida Building Code, will it survive a hurricane. A Zoning Improvement Permit is about land use: is the thing allowed in this district, is it the right distance from the property line, does it push the lot past its coverage limit.

They are separate reviews, separately triggered. Work can be exempt from one and fully subject to the other. When the County's exemption list says something is exempt, it is almost always answering only the building-permit question, and it says so at the top: the exemptions "are from Florida Building Code permit requirements only, unless otherwise noted. Other State and County regulatory departments and agencies may require approvals or permits."

So the useful way to read the list is as two columns, which is how the tables below are built.

Single-family homes, duplexes, townhouses and condos

These exemptions come from Section 102.2.5 of the Florida Building Code as applied in unincorporated Miami-Dade. Every item below shares one cap, covered in the next section, and it is the part that catches people.

WorkBuilding permitZoning permitThe catch
Window air conditioning unit replacementNoNoCounts against the $5,000 cap
Ductless range hood installationNoNo
Canvas or cloth awning, repair or replacementNoNoA new awning installation requires a Zoning Improvement Permit
Pergola or trellis, non-roofed and non-wind-resistantNoYesRoofed or wind-resistant means a building permit
Rain gutter installation or repairNoNo
Screening an existing covered patio, balcony or porchNoNoThe patio must already be covered and permitted
Chain-link fenceNoYesNot if it serves as a swimming pool barrier
Concrete slabs outside the building: open patios, walkways, pavers, garbage container padsNoNoExcludes screened patios and pool slabs
Storage shed removalNoNoOnly if no electrical or plumbing work is involved
Wood decks 18 inches or less above groundNoNoOver 18 inches needs a permit
Pool resurfacingNoNoOnly if it does not affect any electrical connection
Enclosure or protection of an exterior water heater tankNoNoHousing the tank only
Floor surfacing: carpet, tile, brick, wood, ChattahoocheeNoNoSingle-family up to 4 dwelling units only
Re-application of roof maintenance coating over an existing roofNoNoWaterproofing roof coatings do require a permit

Electrical work on this list is narrower. Repair work by a licensed electrical contractor is exempt up to $500 in materials and labor. Two things are exempt regardless of value: repair or replacement of wall switches and receptacles rated 15 to 20 amps at 120 volts or less, and low-voltage systems in single-family homes, duplexes and townhouses, which explicitly excludes condominiums.

And the pool carve-out appears again: all repairs or replacement of electrical equipment on an existing swimming pool require an electrical permit, whatever it costs.

The $5,000 cap is on the property, not on the job

This is the trap, and it is worth slowing down for.

The County's wording: the total cost in the aggregate of all the above work, performed by owner-builders or contractors, in any 12-month period, cannot exceed $5,000.

Read the three things that sentence is doing. It is aggregate, so jobs add together. It covers owner-builders and contractors, so you cannot reset it by hiring someone, and your contractor's work counts against the same pool as your own. And it runs over any 12-month period, which is a rolling window, not a calendar year.

Here is how that goes wrong in practice. Round illustrative numbers:

  • March: re-screen the back patio, $1,800. Exempt.
  • June: new paver walkway and a slab for the garbage containers, $2,100. Running total $3,900. Still exempt.
  • October: resurface the pool, $1,900. Running total $5,800.

Each job looked exempt on its own. The third one pushed the property past $5,000 inside a 12-month window, and the exemption for that work no longer applies. Nobody sends a notice when this happens. It surfaces when something forces the property record open, which in our experience is a sale, a refinance, an insurance inspection, or a neighbor complaint.

The practical discipline is simple and almost nobody does it: keep a dated running total of exempt work on the property, with invoices. If you are approaching $5,000 in a rolling year, the next job gets permitted even if it appears on the exempt list.

Minor repairs, residential and commercial

These come from Section 105.2.2 and they are structured differently. Most carry a $500 per-trade cap on repair work, plus a list of specific items that are exempt regardless of value. The regardless-of-value lists almost all carry a condition people miss, covered right after the table.

TradeExempt up to $500Exempt at any value
Electrical Repair work in materials and labor Electric water heater 4,500 watts or less and up to 50 gallons; AC changeout at the same amperage; low-voltage devices under 98 volts (telephone, television, data cable, central vacuum, burglar alarm, intercom); wiring to pumps or motors under 1 h.p.; time clocks
Plumbing Repair work by a licensed plumbing contractor Gas appliances other than water heaters; exact changeout of an above-ground LP tank; irrigation repair; faucets; water closet, bidet and urinal fixtures; sink, lavatory and drinking fountain fixtures; residential pool equipment other than a pool heater; domestic water shut-off valves; garbage disposals; dishwashers; electric water heaters up to 50 gallons
Mechanical Repair work by a licensed mechanical contractor Air conditioning duct repair; coil, compressor or refrigerant piping inside equipment; non-combustion heating inside equipment; fans inside equipment
Building Non-structural repair by a licensed building contractor, no occupancy change, no life-safety effect Roof covering up to $2,000 and no more than two roofing squares, by a licensed roofing contractor; interior door repair or exact replacement unless life-safety; exterior door slabs; window glass panes; stucco resurfacing of masonry and concrete walls

The licensed-contractor condition

Read the plumbing, mechanical and building rows again. The County's language is that those items are exempt "when performed by a licensed plumbing contractor," "by licensed mechanical contractors," "by a licensed roofing contractor."

The exemption attaches to who does the work, not only to what the work is. A licensed plumber replacing your water heater is exempt. The identical replacement done by a handyman, or by you, is not covered by that paragraph. This is the second most common way we see an exemption evaporate, and it is invisible if you only read the item list.

The AC changeout, which deserves its own warning

An air conditioning changeout of the same electrical amperage is exempt from the electrical permit. The County then says, in its own parenthetical: while an electrical permit is not required for an exact air conditioning changeout, a mechanical permit is required.

That sentence is the whole problem. People find the exemption, stop reading, and skip the permit entirely. Unpermitted AC changeouts and mini splits are one of the most common violations in Miami-Dade and Broward, and our guide to the HVAC permit trap covers what it costs to unwind one.

The water heater rule has a similar edge. Electric water heaters are exempt at 4,500 watts or less and up to a 50-gallon tank, but if the new unit's wattage is greater than the one it replaces, the exemption is gone and a permit is required.

Work the Building Code does not regulate at all

A separate group: not exempt from the Code so much as outside it. A building permit is not required, but other agencies may still require approval, and the zoning column does a lot of work here.

WorkZoning permitThe catch
Interior or exterior paintingNo
Roof paintingNoWaterproofing roof coatings require a permit
Decorative ironworkNoSecurity bars, doors and railings require a permit
Kitchen cabinets, vanities or paneling replacementNoSame configuration only. Relocating or altering plumbing, ventilation or electrical requires a building permit
Playground equipment: swings, slides, monkey bars, basketball hoops, above-ground trampolinesNoMust meet zoning setbacks. Any electrical service requires a permit
Decorative pools and fishponds, smallYesUnder 24 inches deep, under 250 sq ft, under 2,250 gallons. The County's wording mixes "or" and "and", so treat all three as limits
Swale and drainage excavation above the water tableNoMust comply with Chapter 24 environmental regulations
Paving and drainage of existing parking lotsYes
Resurfacing, re-striping or seal coating an existing parking lotYesReconfiguring the layout or triggering accessibility means a building permit
Painted wall signs and balloon signsYes

Satellite antennas sit in their own group under federal law: one meter, roughly 39 inches, or less in diameter needs no permit, on commercial and industrial property and on residential primary structures. The County notes the obvious corollary, that exemption from a permit is not permission to install it unsafely.

Two patterns that run through the entire list

Pools are carved out of almost everything

Collect the pool references scattered across the County's five sections and a rule emerges that the document never states directly:

  • Chain-link fences are exempt unless they satisfy swimming pool barrier requirements.
  • Concrete slab exemptions exclude pool slabs.
  • Pool resurfacing is exempt only if it does not affect any electrical connection.
  • All repairs or replacement of electrical equipment on an existing pool require an electrical permit, at any value. The County prints this twice, under two different sections.
  • Residential pool equipment repair is exempt for licensed plumbers except pool heaters.

If your project touches a pool, the working assumption should be that a permit is required until the County tells you otherwise. The reason is not bureaucratic: pool barrier and pool electrical rules are life-safety provisions, and our guide to Section 33-12 barrier requirements covers what they demand.

Half of these exemptions are really contractor licensing rules

Across Section 105.2.2, the exemption repeatedly depends on a licensed contractor performing the work. That turns a chunk of the exemption list into something other than what it looks like. It is not a list of work that is inherently low-risk. It is a list of work the County is willing to leave unreviewed because a licensed professional is accountable for it.

Which is why the same job done by an unlicensed handyman is not exempt, and why "my guy said it didn't need a permit" is the sentence that precedes a large share of the cases we take on.

The HB 803 exemption sits on top of all this

Everything above is the standing Miami-Dade exemption framework. Separately, Florida HB 803 created a statewide exemption, effective July 1, 2026, for work valued under $7,500 on a single-family dwelling, under Section 553.79(1)(g) of the Florida Statutes.

It does not replace the list above, and it is narrower than it sounds. It excludes any property partially or entirely in a flood hazard area, which removes a great deal of Miami-Dade. It excludes all electrical, plumbing, structural, mechanical and gas work at any value. It cannot be claimed by splitting a project into phases. And it requires a written exemption request filed with the County before the work, with documentation of value.

Our full breakdown is in the HB 803 guide, including the clause stating that the local government has no legal duty for exempted work, which matters more than any other sentence in that statute.

This list is unincorporated Miami-Dade only

Everything here describes the County's own jurisdiction. Thirty-four municipalities inside Miami-Dade run their own building departments, and a city is free to be stricter than the County baseline.

In practice the gaps that catch people are in the cities with design review or historic districts. Coral Gables applies Board of Architects review to work the County would wave through. Miami Beach layers historic district review across much of the city. Hialeah, Doral and the others each administer their own process. If you are in unincorporated Miami-Dade, this list is yours. Anywhere else, confirm with your city before relying on it.

If the work is already done

Most people who end up reading an exemption list in detail are not planning a project. They are checking whether something already built was allowed.

If it turns out it was not exempt, the work is unpermitted, and the route is the after-the-fact permit. The scope gets documented, drawings or engineering get produced where the Code requires them, and the permit is applied for and inspected after the fact. If a Notice of Violation has already issued, many jurisdictions apply a double permit fee, and code enforcement penalties accrue daily while the case is open. Our guide to working without a permit covers the full path, and how penalties accrue covers the arithmetic on the fines.

The honest sequencing advice: find out what is actually on the property record before you decide anything. Request a specialist review and we check for open permits, active violations and recorded liens, and come back within one business day with what needs resolution, if anything.

The short version

If you remember four things from this page, make it these.

  • Exempt from a building permit is not exempt from a zoning permit. Chain-link fences, non-roofed pergolas, new awnings, decorative ponds, painted wall signs and parking lot resurfacing all still require a Zoning Improvement Permit.
  • The $5,000 cap is a rolling 12-month total on the property, across owners and contractors, not an allowance per job.
  • An AC changeout still needs a mechanical permit, even though it is exempt from the electrical permit.
  • Many exemptions only exist when a licensed contractor does the work. The same job done by anyone else is not covered.

This article summarizes published Miami-Dade County permit exemptions for unincorporated areas, captured November 1, 2026, and is general information rather than legal advice or a determination by a building official. Exemptions change, and the building official with jurisdiction over your property makes the final call. The County's own page is the authoritative source: Miami-Dade permit exemptions.

Permit Solutions Services is a Miami-based specialist firm resolving permit violations, after-the-fact permits, open permits and complex compliance cases across Miami-Dade and Broward counties. To have a specialist review your property's record, request a review or call 305-600-9422.

FAQ

Common questions

What work does not require a building permit in Miami-Dade?

Unincorporated Miami-Dade publishes exemptions in five groups: structures exempt from the Florida Building Code under Section 553.73(10) of the Florida Statutes, items the Building Code does not regulate at all such as interior and exterior painting and decorative ironwork, work on single-family homes, duplexes, townhouses and condominiums under Section 102.2.5 capped at $5,000 in aggregate over any 12-month period, minor repairs under Section 105.2.2 with per-trade caps of $500 and a $2,000 roofing cap, and satellite antennas one meter or less in diameter. Separately, HB 803 added a statewide exemption for work under $7,500 on a single-family dwelling outside a flood hazard area.

Does permit exempt mean I need no permit at all?

No, and this is the single most expensive misreading on the County list. More than a dozen exempt items still require a Zoning Improvement Permit, including chain-link fences, non-roofed pergolas and trellises, new awning installations, decorative ponds, painted wall signs and parking lot resurfacing. The County writes those requirements in parentheses after the word exempt. Being exempt from the Florida Building Code is not the same as being exempt from zoning review, and a missed zoning permit produces a violation exactly like a missed building permit.

What is the $5,000 permit exemption limit in Miami-Dade?

Under Section 102.2.5 of the Florida Building Code as applied in unincorporated Miami-Dade, the total cost in the aggregate of all exempt work on a single-family residence, duplex, townhouse or condominium unit, performed by owner-builders or contractors in any 12-month period, cannot exceed $5,000. It is a rolling cap on the property, not a per-job allowance. Three separate $2,000 jobs in the same year total $6,000 and push the property over the limit, which can make work that looked exempt when it was done retroactively unpermitted.

Do I need a permit to replace my air conditioner in Miami-Dade?

Yes, a mechanical permit. Changing out air conditioning equipment of the same electrical amperage is exempt from the ELECTRICAL permit requirement under Section 105.2.2, and the County states explicitly that while an electrical permit is not required for an exact changeout, a mechanical permit is required. This is one of the most common violations we see, because homeowners and some installers read the electrical exemption and conclude no permit is needed at all.

Does a chain-link fence need a permit in Miami-Dade?

A chain-link fence does not require a building permit in unincorporated Miami-Dade, but it does require a Zoning Improvement Permit, and the exemption does not apply to any fence intended to satisfy swimming pool barrier requirements. A pool barrier fence requires a building permit regardless of material. Wind-resistant fences are structural work and always require a permit, including under the HB 803 $7,500 exemption.

Do pools change the permit exemptions?

Yes, and consistently. Pools are carved out of nearly every exemption on the County list. Chain-link fences are exempt unless they serve as a pool barrier. Pool resurfacing is exempt only if it does not affect electrical connections. All repairs or replacement of electrical equipment on an existing swimming pool require an electrical permit regardless of value. Residential pool equipment repairs are exempt for licensed plumbing contractors except pool heaters. If your project touches a pool, assume a permit until the County confirms otherwise.

Do these exemptions apply in Coral Gables, Hialeah or Miami Beach?

Not automatically. The published list governs unincorporated Miami-Dade County. Each incorporated municipality administers its own building department and may apply narrower exemptions, additional zoning review, or historic district requirements on top of the County baseline. Coral Gables, Miami Beach and the historic districts in particular run review processes that catch work the County would treat as exempt. Confirm with the building department for your specific jurisdiction before relying on any exemption.

What happens if I did exempt work that turned out not to be exempt?

It becomes unpermitted work, and the route to resolving it is the after-the-fact permit. That is the same path as any other unpermitted work: the scope gets documented, drawings or engineering are produced where required, and the permit is applied for and inspected after the fact. If a Notice of Violation has already been issued, many jurisdictions apply a double permit fee. The sooner it is addressed the cheaper it is, because code enforcement penalties accrue daily once a case opens.